Whether you need a set of trusses for a small cabin or a full timber frame home,
at MoreSun we can help you achieve the results you want.
A typical series of steps that occur during the timber framing process:
- Initial client meeting
- Architectural floor plans drafted
- Elevations and conceptual timber frame design
- Budgeting value engineering (if needed)
- Structural engineering and shop drawings
- Order timber
- Layout and cutting of each timber
- Test fit frame and drill peg holes
- Finishing, usually sanding and oiling
- Delivery to site
- Assembly and raising
- Celebration!!!
- Tongue and groove ceiling decking and/or roof Structural Insulated Panels if desired
- Remainder of the home is completed by local General Contractor
A glimpse of MoreSun's part of the timber framing process:
Measuring a forked timber
Laying out measurements on timbers
Cleaning a mortise joint
Test fitting a timber frame in the shop
Timbers assembled on site and ready for raising
Raising a timber frame on site
Attaching whetting bush after raising
Crew after long days of raising a timber frame
Tongue & groove ceiling decking installed
Our scope of work is the timber frame itself. We act as a subcontractor on projects and come in after your foundation is ready. We cut and test fit the timber frame in our shop and then come to site to raise it. If desired we can install tongue and groove ceiling decking and roof structural insulated panels. Your contractor handles all permitting and the rest of the project, as needed.





